Pre-Commissioning Check Sheet (to be completed by customer/installer)

Check Sheet

Information for site visit

The purpose of our visit is for commissioning of the AOV system only.
All first fix of cabling and containment will need to be completed before site attendance with information provided on cabling (cores used, junction boxes etc).
All second fix of equipment to be completed.
System design, smoke control strategy along with cause and effect will be required prior to site.
If no cause and effect provided system will be configured in line with current smoke control system.